Data Center Commissioning — NETA Testing, IST & Operational Acceptance

SolutionsCommissioning

Testing & Commissioning

Commissioning Is Your Last Line of Defense Before Go-Live

Infrastructure defects discovered during commissioning cost thousands to fix. The same defects discovered after go-live cost millions. DCS Global's NETA-certified commissioning process tests every system, documents every result, and certifies every facility before it accepts production load.

Commissioning Capabilities

Integrated Systems Testing

Level 3 IST — the most critical commissioning phase — tests all subsystem interactions under simulated failure scenarios: utility outages, UPS failures, cooling failures, and fire alarm activations.

NETA Electrical Testing

NETA ATS acceptance testing for all electrical equipment — transformers, switchgear, UPS systems, generators, and PDUs — performed by NETA ETT-certified technicians before energization.

Load Bank Testing

Full-load testing of UPS systems and generators using portable load banks — verifying capacity, efficiency, transfer times, and governor response at 100% rated load.

Tier Certification Support

Commissioning documentation and test witnessing for Uptime Institute Tier III and Tier IV certification — including IST scenario development, test execution, and certification package preparation.

Factory Acceptance Testing

FAT at equipment manufacturer facilities for UPS systems, generators, and switchgear — verifying specifications before shipment to reduce on-site defect risk.

Commissioning Documentation

Complete commissioning packages: test plans, acceptance criteria, test reports, punch lists, as-built drawings, equipment settings records, and commissioning completion certificates.

Cx Levels

Five Levels of Commissioning

A structured progression from individual component verification to ongoing seasonal retesting — each level builds on the last.

1

Cx Level 1 — Component Verification

Individual component testing. Verify each piece of equipment operates per manufacturer specifications. Performed by equipment vendors or installation contractors.

2

Cx Level 2 — Subsystem Testing

Test each subsystem (UPS, generator, cooling) in isolation. Verify all components within a subsystem work together correctly. Performed by DCS Global commissioning engineers.

3

Cx Level 3 — Integrated Systems Testing (IST)

Most Critical Phase

Test interactions between subsystems. Simulate failure scenarios (utility outage, UPS failure, cooling failure) and verify the facility responds correctly. The most critical commissioning phase.

4

Cx Level 4 — IST with IT Load

Repeat Level 3 with actual IT equipment installed and running. Verify the facility performs under real load conditions.

5

Cx Level 5 — Seasonal/Ongoing Commissioning

Periodic retesting to verify continued performance as the facility ages and loads change. Annual or biennial.

NETA Standards

NETA Standards Reference

DCS Global field engineers hold NETA ETT certification and perform NETA ATS acceptance testing and NETA MTS maintenance testing for all critical electrical equipment.

NETA ATS

Acceptance Testing Specifications

Standards for testing new electrical equipment before energization. Covers transformers, switchgear, UPS, generators, PDUs, and protective relays. Required for Tier III/IV commissioning.

NETA MTS

Maintenance Testing Specifications

Standards for periodic testing of in-service electrical equipment. Defines test intervals and acceptance criteria for ongoing maintenance programs.

NETA ETT

Electrical Testing Technician

Certification for individual technicians performing electrical testing. DCS Global field engineers hold NETA ETT certification.

Equipment TypeNETA ATS TestTest Interval (NETA MTS)DCS Global Capability
TransformersInsulation resistance, turns ratio, power factor3 years
SwitchgearContact resistance, insulation resistance, relay calibration3 years
UPS SystemsLoad bank test, battery discharge, transfer testAnnual
GeneratorsLoad bank test, governor test, ATS transferAnnual
PDUsInsulation resistance, torque verification3 years

Delivery Process

Commissioning Phases

01

Commissioning Plan Development

Develop commissioning plan including test procedures, acceptance criteria, scenario scripts, and schedule. Align with design engineer and contractor.

02

Level 1 — Component Verification

Witness and document vendor startup and component-level testing for all major equipment. Issue punch list for deficiencies.

03

Level 2 — Subsystem Testing

Test each subsystem in isolation: UPS, generator, ATS, cooling, fire suppression, BMS. Verify subsystem performance against design specifications.

04

Level 3 — Integrated Systems Testing

Execute IST scenarios with all subsystems integrated. Simulate utility outages, equipment failures, and emergency scenarios. Document results and remediate deficiencies.

05

Level 4 — IST with IT Load

Repeat critical IST scenarios with IT equipment installed and operating. Verify facility performance under actual production load conditions.

06

Documentation & Certification

Compile commissioning completion package: all test reports, as-built drawings, equipment settings, punch list resolution, and commissioning certificate.

Technical Specifications

Commissioning LevelsCx Level 1 through Level 5 (ongoing)
Electrical TestingNETA ATS/MTS certified technicians
IST ScenariosUtility outage, UPS failure, cooling failure, fire alarm
Load Bank TestingUp to 4 MW portable load bank capacity
Tier CertificationUptime Institute Tier I–IV commissioning support
StandardsNETA ATS/MTS, NFPA 70, NFPA 110, TIA-942
DocumentationFull commissioning package: plans, reports, as-builts
IndustriesEnterprise, colocation, hyperscale, government, healthcare

Frequently Asked Questions

What is integrated systems testing (IST) and why is it the most important commissioning phase?

Integrated Systems Testing (IST) — also called Level 3 commissioning — tests the interactions between all facility subsystems under simulated failure conditions. We simulate utility power outages, UPS failures, generator failures, cooling failures, and fire alarm activations to verify the facility responds correctly in every scenario. IST reveals integration issues that component-level testing cannot find — for example, a generator that starts correctly in isolation but fails to pick up load when the ATS transfers, or a cooling system that doesn't respond correctly when a CRAC unit fails. IST is required for Uptime Institute Tier certification.

What is a factory acceptance test (FAT) and when is it performed?

A Factory Acceptance Test (FAT) is performed at the equipment manufacturer's facility before shipment to verify the equipment meets specifications. For UPS systems, FAT includes full-load testing, efficiency measurement, battery discharge testing, and transfer switch operation. For generators, FAT includes load bank testing at rated capacity, governor response testing, and protective relay calibration. FAT reduces the risk of discovering defects after equipment is installed in the facility, when remediation is much more expensive.

How long does commissioning take for a new data center?

Commissioning duration depends on facility size and complexity. A small data center (1-2 MW) typically requires 4-8 weeks of commissioning. A large enterprise data center (5-20 MW) requires 8-16 weeks. A hyperscale facility (50+ MW) may require 6+ months of phased commissioning. The critical path is usually IST — which requires all subsystems to be installed and individually tested before integrated testing can begin. DCS Global develops commissioning schedules during design to ensure commissioning is on the project critical path.

What documentation is produced during commissioning?

DCS Global commissioning produces a complete documentation package: commissioning plan (test procedures, acceptance criteria, schedule), test reports for every component and subsystem test, IST scenario results, punch list of deficiencies and resolution status, as-built single-line diagrams updated to reflect actual installation, equipment settings records (UPS parameters, generator governor settings, relay calibration), and a commissioning completion report certifying the facility meets design intent. This documentation package is required for Uptime Institute Tier certification and is essential for ongoing operations.

Commission Your Facility to the Standard Your Uptime Commitment Requires

DCS Global commissioning engagements deliver complete NETA test documentation, IST scenario results, and as-built records — the package your Tier certification and compliance auditors require.