Skip to main content
DCS Global

Data Center Build Services: Construction, Fit-Out & Infrastructure Delivery

SolutionsBuild Services

Design & Construction

Data Center Build Services

Turnkey construction with self-perform electrical, mechanical, and low-voltage trades. From groundbreaking through commissioning: ne team, one contract.

The DCS Global Build Advantage

Self-Perform Advantage

We self-perform electrical, mechanical, and structured cabling, liminating subcontractor markup, coordination gaps, and schedule risk.

Critical Power Expertise

Our electricians are NFPA 70E certified and have installed thousands of switchgear, UPS, and PDU systems in live data center environments.

Mechanical Precision

From chiller plants to in-row cooling, our mechanical crews are trained on mission-critical tolerances and startup procedures.

Safety-First Culture

EMR below 0.7, OSHA 30-trained superintendents, and a zero-incident safety program on every project site.

Integrated Project Delivery

Design-build and CM at Risk delivery models with co-located design and construction teams for faster decisions and fewer RFIs.

Schedule Certainty

Detailed CPM schedules, weekly look-ahead planning, and proactive procurement management to protect your go-live date.

Our Process

Construction Phase Breakdown

01

Pre-Construction

Constructability review, value engineering, subcontractor pre-qualification, long-lead procurement, and detailed CPM schedule development.

02

Site Preparation

Demolition, earthwork, utilities, and foundation work. Early coordination with AHJ for permit sequencing and inspection milestones.

03

Structural & Envelope

Structural steel, concrete, roofing, and building envelope. Coordination with MEP rough-in to avoid conflicts and maintain schedule.

04

MEP Rough-In

Self-perform electrical distribution, mechanical rough-in, and low-voltage infrastructure. BIM coordination reduces field conflicts.

05

Equipment Installation

UPS, switchgear, PDUs, generators, cooling units, and IT infrastructure. Factory witness testing coordinated with installation schedule.

06

Commissioning & Handover

Integrated systems testing, Tier certification support, O&M training, and as-built documentation package delivery.

Build Capabilities

Project Size500 kW – 100+ MW critical load
Self-Perform TradesElectrical, mechanical, low-voltage
Delivery MethodsDesign-Build, GC, CM at Risk
CertificationsOSHA 30, NFPA 70E, BICSI RCDD
Safety RecordEMR < 0.7, zero-incident programs
CommissioningIntegrated Cx through Tier IV ICA
Warranty1-year standard, extended available
Typical Timeline12 – 36 months construction phase

Frequently Asked Questions

What trades does DCS Global self-perform?

We self-perform electrical (MV and LV), mechanical (HVAC, plumbing, piping), and structured cabling/low-voltage. This covers the majority of critical infrastructure scope on a typical data center project.

Can DCS Global deliver design-build?

Yes. We offer design-build delivery with our in-house engineering team, as well as GC and CM at Risk for owner-designed projects. Design-build typically compresses schedule by 15–25%.

How do you handle live-environment construction?

We have extensive experience building in and adjacent to live data centers. Our crews are trained on energized work procedures, and we develop detailed outage plans and temporary power strategies for every live-environment project.

What is your safety record?

Our Experience Modification Rate (EMR) is below 0.7, which is significantly better than the industry average of 1.0. All superintendents hold OSHA 30 training, and we maintain a zero-incident safety program.

Do you provide commissioning services?

Yes. We provide integrated commissioning from Level 1 through Level 5, including Tier certification support. Our commissioning team is embedded in the construction team from day one.

Full Lifecycle Delivery

Installation, Start-Up & Lifecycle Services

DCS Global manages the complete data center build lifecycle: rom turnkey installation and start-up through commissioning handover and ongoing maintenance: under a single point of accountability.

Turnkey Installation & Start-Up

Business Challenge

Data center installation requires precise sequencing across electrical, mechanical, network, and IT trades, ith a single point of accountability for schedule, quality, and safety.

DCS Global Capability

DCS Global manages turnkey installation of critical systems: UPS, generators, PDUs, cooling, cabling, and IT infrastructure, ith a single project manager accountable for schedule, quality, and safety. Start-up procedures follow OEM specifications and are documented for commissioning handover.

Customer Outcome

A fully installed and started-up facility with documented OEM start-up records, verified system performance, and a commissioning-ready handover package.

New build or major expansionCommissioning Services

Commissioning Handover & Documentation

Business Challenge

The gap between construction completion and operational readiness is where most data center projects lose time and expose risk: undocumented systems, incomplete testing, and missing as-built records.

DCS Global Capability

DCS Global delivers a structured commissioning handover. Depending on project scope, the package may include as-built documentation, OEM start-up records, NETA acceptance test results, integrated systems test reports, equipment warranties and supporting records, and operations and maintenance documentation.

Customer Outcome

An operations team that inherits a fully documented facility, ith as-built drawings, test records, and maintenance procedures that support reliable long-term operations from day one.

Construction completion to operationsMaintenance Programs

Ongoing Maintenance & Lifecycle Support

Business Challenge

Data center infrastructure requires ongoing preventive maintenance to sustain the performance levels achieved at commissioning, and a maintenance partner who understands the systems they installed.

DCS Global Capability

DCS Global provides ongoing maintenance programs for the critical systems we install: UPS, cooling, power distribution, and cabling, ith scheduled PM visits, emergency response, and lifecycle planning that extends equipment service life and defers capital refresh costs.

Customer Outcome

A maintained facility that performs to commissioning specifications over its full design life, with a maintenance history that supports equipment warranty claims, insurance underwriting, and regulatory compliance.

Post-commissioning operationsMaintenance Programs

Safe Decommissioning & Material Recovery

Business Challenge

End-of-life data center equipment: batteries, UPS systems, servers, and electrical infrastructure: must be decommissioned safely, with documented chain of custody and responsible material recovery.

DCS Global Capability

DCS Global manages safe decommissioning of data center critical systems, ncluding battery energy storage, UPS systems, generators, and IT equipment, ith full recycling of batteries, metals, and electronic materials. Chain-of-custody documentation and certificates of recycling provided.

Customer Outcome

A fully decommissioned facility with zero environmental liability, documented material recovery, and certificates of recycling that satisfy regulatory and sustainability reporting requirements.

End-of-life or facility repurposingData Center Design

Why Organizations Act

Business Challenges We Solve

Schedule Risk on Critical Projects

Data center construction delays directly impact revenue. Every week of delay costs organizations in lost capacity, extended colocation contracts, and deferred business initiatives.

Subcontractor Coordination Failures

General contractors relying on multiple subcontractors for electrical, mechanical, and low-voltage work create coordination gaps, RFI backlogs, and change order disputes.

Live-Environment Construction Risk

Expanding or retrofitting an operating data center requires specialized procedures, energized work training, and meticulous outage planning that general contractors lack.

Commissioning & Certification Gaps

Many construction firms lack the commissioning expertise to achieve Tier III or Tier IV certification: leaving owners with facilities that cannot meet their availability targets.

Cost Overruns from Poor Estimating

Inaccurate early estimates lead to budget surprises during construction. Value engineering after design is complete is expensive and often compromises performance.

Talent Shortages in Critical Trades

Finding electricians and mechanical technicians with data center experience is increasingly difficult. Self-perform contractors with dedicated critical facilities crews solve this problem.

Vendor-Neutral Expertise

Technology Ecosystem

DCS Global is vendor-neutral and works with the leading platforms in the industry. We recommend the right technology for your requirements — not the vendor with the best margin.

Power Equipment

Eaton
Vertiv
Schneider Electric
ABB

Generator Systems

Caterpillar
Cummins
Kohler

Cooling Systems

Liebert / Vertiv
Stulz
Airedale

BIM & Design Tools

Autodesk Revit
Navisworks

Project Management

Procore

Vendor-Neutral Advisory

DCS Global holds no exclusive reseller agreements that would bias our recommendations. Our engineers are certified across multiple platforms and will specify the solution that best fits your technical requirements, budget, and long-term roadmap.

Trusted Advisor Framework

Data Center Build Buyer's Guide

Use this framework to evaluate your requirements before engaging vendors. Organizations that complete this analysis make faster decisions and achieve better outcomes.

What is your target Tier level?

Tier I through Tier IV have dramatically different cost and complexity profiles. Tier IV fault tolerance can cost 2–3x more than Tier II. Define your availability requirement before design begins.

What is your power density requirement?

AI and HPC workloads require 20–50+ kW per rack: far above the 5–10 kW typical of traditional enterprise data centers. Power density drives cooling strategy, structural requirements, and cost.

What is your delivery model preference?

Design-build compresses schedule by 15–25% but requires trust in a single firm. GC and CM at Risk give owners more control but require more coordination. Define your risk tolerance early.

What are your commissioning requirements?

Tier certification requires documented commissioning from Level 1 through Level 5. Engaging the commissioning team during design, not after construction: prevents costly rework.

What is your phasing strategy?

Building for 10-year capacity on day one is expensive. Modular, phased construction allows you to build for current needs with infrastructure designed to scale, educing initial capital by 30–40%.

What are your sustainability targets?

PUE targets, water usage effectiveness (WUE), and renewable energy commitments affect cooling strategy, site selection, and utility negotiations. Define these before schematic design.

Not sure where to start? Our solutions advisors can walk you through this framework in a 30-minute discovery call.

Schedule an Infrastructure Assessment

Decision Framework

Design-Build vs. Design-Bid-Build

Choosing the right delivery model for your data center construction project.

CriterionDesign-BuildDesign-Bid-BuildBest For
ScheduleFaster: design and construction overlapSlower: sequential phasesDesign-Build
Cost CertaintyGuaranteed maximum price availableCompetitive bidding may yield lower priceDepends
Owner ControlLess: single firm makes design decisionsMore: owner controls design separatelyDesign-Bid-Build
AccountabilitySingle point of responsibilitySplit between designer and contractorDesign-Build
Change Order RiskLower: design team understands constructabilityHigher: design gaps discovered during constructionDesign-Build
Competitive PricingLess competitive: single firmMore competitive: multiple biddersDesign-Bid-Build
InnovationHigher: integrated team can optimize holisticallyLower: contractor builds to specDesign-Build

This comparison is a general framework. The right choice depends on your specific requirements, existing environment, and business objectives. DCS Global can help you evaluate the options for your situation.

Commissioning Handover & Documentation

DCS Global build projects include a structured commissioning handover. Depending on project scope, the documentation package may include as-built documentation, OEM start-up records, NETA acceptance test results, integrated systems test reports, equipment warranties and supporting records, and operations and maintenance documentation — giving operations teams the reference record required to support the systems placed into service.

Commissioning services

Next Step

Ready to Break Ground?

Share your project scope, timeline, and location: ur construction team will provide a preliminary estimate within 5 business days.

No-cost initial consultation
National and international project support
ISO 9001 · ISO 27001 certified
24/7 emergency support